DreamLine DL-6963C-01CL Przewodnik Instalacji

Przeglądaj online lub pobierz Przewodnik Instalacji dla Nie DreamLine DL-6963C-01CL. DreamLine DL-6963C-01CL Installation Guide Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 30
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
Visions Shower Door & Base Kit
SHOWER Door AND SHOWER BASE KIT INSTALLATION INSTRUCTIONS
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to the support.BathAuthority.com web page.
STEP 1: Install Shower Base
Shower Base Installation Instructions
STEP 2: Install Shower Door
Shower Door Installation Instructions
Please read these instructions carefully before installing. If you have any questions regarding
installation, please call our technical support specialists Monday through Friday 9:00 AM 5:00
PM EST at Phone: 1-866-731-2244, Fax: 1-866-227-1533 or e-mail our technical support
group at
For more information on DreamLine Shower Kit please visit www.BathAuthority.com
Przeglądanie stron 0
1 2 3 4 5 6 ... 29 30

Podsumowanie treści

Strona 1 - IT INSTALLATION INSTRUCTIONS

Visions Shower Door & Base Kit SHOWER Door AND SHOWER BASE KIT INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alt

Strona 2 - IMPORTANT

Rev 1.6 9 NOTE: Glass Door (04) comes with preinstalled Wheel assemblies (17). If not, please refer to (Fig. 11) for detailed installation. 12. Faste

Strona 3 - Tools Required

Rev 1.6 10 14. Install the Handles (06) to the Glass doors (04). Press the anti-water strips (08) on the vertical edges of the Stationary glasses (05

Strona 4 - Packing List

Rev 1.6 11 16. Apply the sealant along the profiles and guide rails; on the seams between the bottom guide rail and the profiles as well as along the

Strona 5 - Shower Door Installation

SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign

Strona 6 - Fig. 3

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 2Preparation 1. Examine boxes and packages for shipping damage. Carefully remove Shower base from th

Strona 7

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 3SINGLE THRESHOLD SHOWER BASE Center Drain Configuration MODEL SPECIFICATION D (in) W (in)

Strona 8 - Fig. 8

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 4Left-Hand Drain Configuration MODEL SPECIFICAT

Strona 9

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 5Right-Hand Drain Configuration

Strona 10 - Rev 1.6

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 6NEO SHOWER BASE MODEL SPECIFICATION W (in) A (in) B (in) C (in) DLT-2

Strona 11

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 7QUARTER ROUND SHOWER BASE MODEL SPECIFICATION W (in) C (

Strona 12 - Product Maintenance

Rev 1.6 1 VISION SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products

Strona 13 - SLIMLINE SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 8DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration MODEL SPECIFICATION W (in) C

Strona 14 - Preparation

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 9Left-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in) W1 (in)

Strona 15 - SINGLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 10Right-Hand Drain Configuration MODEL SPECIFICATION D (in) W (in) D1 (in)

Strona 16

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 11Diagram of the Shower Base in a Cross Section Finished Wall Cement board S

Strona 17

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 12Shower Base Installation Preparation 1. Ensure that the floor and the studs are at right angle. Pr

Strona 18 - NEO SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 132. Install the shower drain (NOT PROVIDED) according to the drain installation manual (supplied wit

Strona 19 - QUARTER ROUND SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 14 4. Level the tray and place marks on the studs above the upper edge of the tile flange. See

Strona 20 - DOUBLE THRESHOLD SHOWER BASE

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 15 6. After the bedding material has been poured and before it sets, place the shower base into the p

Strona 21

“SLIMLINE SHOWER BASE” Rev.3 Ver.5 07/2013 16 Fig. 9 Product maintenance To insure long lasting life

Strona 22

DREAMLINE™EXCLUSIVELIMITEDWARRANTYASOFMAY6,2013Thiswarrantyextendsonlytotheoriginalowner/end‐userforhouseholduseonlyandisnottr

Strona 23

Rev 1.6 2Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in t

Strona 24

TEL: 866-731-2244 FAX: 866-227-1533 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Doors please visit www.Bath

Strona 25

Rev 1.6 3Detailed Diagram of Shower Door Components 1234568910111213141516177 Packing List 01 Glass profile 2pcs 10 Round head screw ST4.2×30

Strona 26

Rev 1.6 4Shower Door Installation 1. Measure the distance between two walls. This distance is marked as “W”. See Fig. 1 for details.

Strona 27

Rev 1.6 5 Fig. 3 3. If the Guide rails (03) have been cut, you will need to reinstall the roller stoppers on each Guide rail

Strona 28 - Product maintenance

Rev 1.6 6 4. Fasten the bottom Guide rail (03) to the Glass profiles (01) with the Round head screws ST4.2x25 (11). See Fig. 5 for details.

Strona 29 - WARRANTYSERVICE

Rev 1.6 7 6. Slightly tap the Single side strips (09) in between the Stationary glasses (05) and the Glass profiles (01) using wooden shim or other p

Strona 30 - BATHAUTHORITY.COM

Rev 1.6 8 9. Move the finished frame to the designated position on the shower base, the bathtub or the threshold (depending on your installation); pu

Komentarze do niniejszej Instrukcji

Brak uwag