DreamLine DL-6955C-01CL Przewodnik Instalacji Strona 1

Przeglądaj online lub pobierz Przewodnik Instalacji dla Nie DreamLine DL-6955C-01CL. DreamLine DL-6955C-01CL Installation Guide Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 15
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
DUET
SHOWER DOOR INSTALLATION INSTRUCTIONS
IMPORTANT
DreamLine
TM
reserves the right to alter, modify or redesign products at any time
without prior notice. For the latest up-to-date technical drawings, manuals or any
other details please refer to the support.bathauthority.com
web page.
Please carefully read the instructions before installing. If you have any questions
regarding installation, please call our technical support specialists Monday through
Friday 9:00 AM – 5:00 PM EST at 1-866-731-8378, ext. 3 or e-mail our technical
support group at
For more information on DreamLine
TM
Shower Doors please visit www.BathAuthority.com
Rev 1.1 1
Przeglądanie stron 0
1 2 3 4 5 6 ... 14 15

Podsumowanie treści

Strona 1 - IMPORTANT

DUET SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior

Strona 2 - Tools Required

9. One by one suspend both Glass doors onto the Upper guide rail as shown on Fig.13. Tilt the Glass door (A) a little to make the glass slide into t

Strona 3 - Packing List

10. Slide both Glass Doors to the right. Insert the Left guide block (13) into the channel on the left side of the Guide rail and secure it using th

Strona 4 - Shower Door Installation

12. Fasten the Rubber stopper (14) inside the groove of the Wall profile using the Round head screw ST4.2×16 (08). See Fig. 17 for details.

Strona 5 - Rev 1.1 5

14. Apply the sealant along the profiles and guide rails; on the seams between the bottom guide rail and the profiles as well as along the shower ba

Strona 6 - Fig. 5

© 2012 Bath Authority LLC.All Rights Reserved.DREAMLINE™ LIMITED WARRANTYThis is Bath Authority LLC’s (“DreamLine”) exclusive written warranty effecti

Strona 7 - Fig. 8

TEL: 866-731-8378 – 215-957-1411 FAX: 866-227-9245 – 215-893-1780 WWW.BATHAUTHORITY.COM For more information on

Strona 8 - Fig. 10

Preparation 1. After opening all boxes and packages, read this introduction carefully. Check that all of the needed parts are included in the packag

Strona 9 - Fig. 12

Detailed Diagram of Shower Door Components 1234678910111213145 Packing List 01 Upper guide rail 1pc 08 Round head screw ST4.2×16 16pcs 02 Wa

Strona 10 - Fig. 14

Shower Door Installation 1. Measure the distance between two walls. This distance is marked as “W”. See Fig. 1 for details. F

Strona 11 - Fig. 16

3. Secure Upper guide rail (01) and Bottom guide rail (04) to the Glass profiles (03) with the Flat head screws ST4.2x25 (09). See Fig. 3 and Fig.

Strona 12 - Fig. 18

4. Push the Wall profiles (02) all the way over the Glass profiles (03) at both sides. Make sure the flange of the wall profile faces inside the sho

Strona 13 - Product Maintenance

5. Move the finished frame to the designated position and push it against the walls. If your top and bottom wall opening measurements are different

Strona 14 - LIMITED WARRANTY

7. Apply silicone along the wall profile and around the holes on the wall. Also apply silicone under the bottom guide rail. Place the shower frame b

Strona 15 - ATHAUTHORITY.COM

PLEASE NOTE: • On the outside Glass door (A) the Handle and the Rollers should face out. • On the inside Glass door (B) the Handle and the Rollers

Komentarze do niniejszej Instrukcji

Brak uwag